The Sacramento River Revetment Restoration project involved placing rip-rap (rock) on the levee and removing vegetation along the Sacramento River. This project stabilized the river banks, reduced erosion, and managed vegetation growth.
This restoration work protected the integrity of the levee system and maintained the river channel. By reinforcing the levee with rip-rap and clearing vegetation, the project enhanced flood control and riverine management in the area.